Skip to content
Eco-Space D.System

FOR OFFICES

Smart climate control for office buildings

Zone management, time scheduling, integration with your booking system and ESG reports ready for your corporate report.

Two solutions that work together

  • Eco-Space · How spaces are used
  • D.System · Control of the installations

Together, we connect demand with the installation's response.

In an office, schedules, room bookings and reliable presence signals can help adjust the climate control in each zone. That need can be coordinated with the installation when the project includes the necessary signals, permissions and integrations.

How they work together

THE CHALLENGE

The corporate building's double problem

Modern office buildings have a double problem: zones being conditioned with no one inside for hours, and ESG reports that have to be filled out manually every year. European regulation — CSRD, taxonomy — is adding pressure on management and facility teams to report consumption and emissions reliably.

KEY FEATURES

Four key features for offices

01

Zone and time-slot management

Configure schedules per floor, wing or room. Punctual manual overrides with automatic expiry. No more HVAC running all weekend by accident.

02

Booking-system integration

We can study how to coordinate meeting-room climate control with schedules, bookings and reliable presence signals. Preparation time and rules are agreed according to the use and behaviour of each space.

03

Information for monitoring

We define with you which data and reports you need and what information can be obtained from the installation. Any consumption, savings or emissions indicator must identify its sources, method and scope.

04

Zone-by-zone rollout

We plan the work zone by zone according to the office's activity. We assess the existing infrastructure and the connection options, and agree the work and any possible disruption before starting.

A first phase with a clear scope

We define a first phase for your building: equipment and zones included, integrations required, planned work, cost and how the results will be verified.

Let's talk about your building

Tell us what you want to control better. We review the installation and assess a first phase adapted to your activity.